Concerete Batching Plant

 

CONCRETE BATCH PLANT MODELING GUIDE

Twin Shaft concrete mixer - Lots of concrete at high speed, low wear, low maintenance.  Designed for rough, tough jobs like dam building, ready-mix and prestressed beams.  Handles aggregate sizes to several inches.  Does not discharge completely, so not good for mixes of different type or color.  End of shift cleanout is slow and difficult (unless our high pressure washout system is used).  Performance on dry cast mixes is not as good as the best planetary mixers.  Gives the highest throughput of concrete in a given floor space, can double plant output without modification to hoppers, scales, belts etc.

Read more

 

How dose the concrete batching plant work?

Concrete mixing plant is divided into four parts: gravel feed, powder (cement, fly ash, bulking agents, etc.) to feed, water and feed additives, transmission and storage stirred their workflow shown in Figure 1. , the mixer control system power, into the human - machine dialogue operation interface, system initialization process, including recipe number, grade concrete slump, producers, etc. according to the amount of weight carried on each silo, weighing hoppers. detection, output material or material empty full signal, prompting the operator to determine

Read more

 

What is the best type of concrete batch mixer

Concrete mixing plant is divided into four parts: gravel feed, powder (cement, fly ash, bulking agents, etc.) to feed, water and feed additives, transmission and storage stirred their workflow shown in Figure 1. , the mixer control system power, into the human - machine dialogue operation interface, system initialization process, including recipe number, grade concrete slump, producers, etc. according to the amount of weight carried on each silo, weighing hoppers. detection, output material or material empty full signal, prompting the operator to determine

Read more

 

Installation Tips of Batching Plant

First stage: Preparation of concrete foundation and wellness It takes one day to complete the measurement and actinomycetes work of concrete mixing plant by measuring class; It takes two days time for foundation excavation and processing; It takes three days time for pouring the concrete foundation; It takes 10 days for concrete foundation regimen. Twice stage: Mechanical Installation 1. Aggregate batching system installation 2. The main frame installation 3. Installation of metering devices 4. Belt conveyor installation 5. Cement silo and screw conveyor installation 6. The installation waterway, additives pipeline and admixtures pump machine fixed on a storage bin. 

Read more